The flood is one of the natural disasters that doesnt create itself but the landuse change will be caused it that makes a lot of human and financial losses every year. In this study in gonbad chi basin to assess the impact of Watershed mechanical operation on flood mapping used fuzzy method and AHP method and composition of slope mapping, landuse, Permeability and flow accumulation that called base mapping. In next setp by determining thelocation ofmechanicaloperations andseparationofthe operationaccordingto dam height and determine the extent of the effect of the mechanical operation using elevation contour lines, the mapping of impact of watershed management operations was prepared. In the end with composition of base mapping with impact of mechanicaloperations, a new map that called flood mapping is created. Although the results have a positiveapproximately9% impact on reducing the risks of flood but these results in a sufficient number of suitable structures would be more effective than showed.
روغنی، محمد؛1391، «بررسی نقش عملیات مکانیکی آبخیزداری در کنترل رواناب حوضۀ آبخیز زایندهرود: مطالعۀ موردی در حوضۀ آبخیز حیدری»، مهندسی آبیاری و آب، شمارۀ 7: 23-11.
سلطانی، محبوبه؛ 1389، «ارزیابی اقدامات آبخیزداری بر سیلخیزی با استفاده از مدل HECHMS (مطالعۀ موردی: حوضۀ آبخیز منشاد»، پایاننامۀ کارشناسی ارشد، دانشگاه منابع طبیعی و کویرشناسی، دانشگاه یزد.
کرم، امیر؛ درخشان، فرزانه، 1391، «پهنهبندی سیلخیزی، برآورد سیلاب و ارزیابی کارایی کانالهای دفع آبهای سطحی در حوضههای شهری (مطالعۀ موردی: حوضۀ آبشوران در کرمانشاه)»، شماره 16: 54-37.
مظفری، غلامعلی؛ 1389. هیدرولوژی شهری، انتشارات دانشگاه یزد، 214 صفحه.
Saaty. Thomas, 1980, The Analytic Hierarchy Process. Mc Graw-Hill International. New York, NY, U.S.A.
Sadeghi. Hamid.Reza. Sharifi, Faranak. 2006, Performance Evaluation of Watershed Management Measures using Qualitative Method (Case Study: Part of Kan Watershed, Iran), Geographical Research. 79(4):37-47.
Plate. Erich, 2002, Flood Risk and Flood Management, Journal of Hydrology 267,P.P.2-11.
USDA. 1986. Urban hydrology for small watersheds. Technical Release 210-VI-TR-55. 160 pp.
Noori,H , Iildoromi,A R , Sepehri,M , Sepehri,N and Artimani,M M . (2015). Assesment of mechanicaloperationson hydrodynamic features of flood. Journal of Ecohydrology, 2(3), 245-252. doi: 10.22059/ije.2015.57294
MLA
Noori,H , , Iildoromi,A R , , Sepehri,M , , Sepehri,N , and Artimani,M M . "Assesment of mechanicaloperationson hydrodynamic features of flood", Journal of Ecohydrology, 2, 3, 2015, 245-252. doi: 10.22059/ije.2015.57294
HARVARD
Noori H, Iildoromi A R, Sepehri M, Sepehri N, Artimani M M. (2015). 'Assesment of mechanicaloperationson hydrodynamic features of flood', Journal of Ecohydrology, 2(3), pp. 245-252. doi: 10.22059/ije.2015.57294
CHICAGO
H Noori, A R Iildoromi, M Sepehri, N Sepehri and M M Artimani, "Assesment of mechanicaloperationson hydrodynamic features of flood," Journal of Ecohydrology, 2 3 (2015): 245-252, doi: 10.22059/ije.2015.57294
VANCOUVER
Noori H, Iildoromi A R, Sepehri M, Sepehri N, Artimani M M. Assesment of mechanicaloperationson hydrodynamic features of flood. ije. 2015;2(3):245-252 (In Persian). doi: 10.22059/ije.2015.57294